Assembling the two laminated bridge beams on to the two doubled trestle bents requires weights and clamps and a lot of patience to ensure that the components are square and aligned correctly. It is at this point that the structure begins to take shape and great care has to be exercised to avoid damaging the pre-built sub-assemblies. You can never have enough weights and clamps to hold everything in place while the glue dries.